Over the weekend Rachel and I painted Taylor’s room “Pink Gingham.” We also installed a new 6 panel door to her room. Her door was the only one in the house that would not latch.
I wanted to do some other things to her room, but we really did not have the time. Hopefully we can get this done soon.
I will have some pictures as soon as I get my main computer back from the shop.
Phase II of her room includes painting her trim and door “whipped white,” and installing new baseboard trim and a new bi-fold closet door.
Next home project on the list: Basement remodel.
The only task that really worries me is the wiring work I want done. I need to hire someone to pull some cable and cat-5e wire from the attic to the basement.
We plan on gutting it to the block walls, and starting fresh. I need to re-wire some outlets and switches. We are also going to rework our old and tired brick fireplace.
I hope to have this done by next spring. Hopefully my wife will release her kung-fu grip on our checkbook so we can finally utilize our entire home. Since we’ve moved in our basement area has been only used for storage.